samedi 19 septembre 2009

Welcome New Chicagoan!

From the comments:
  • Does anyone know what the f*ck is going on a HQ? A construction company is redoing the f*ck up by walsh construction when they originally built the building because water would pool by the west entrance. The new company has poured the concrete and has torn it up not once, not twice, but THREE F*CKING TIMES now and it's still not finished. This is insane and exactly why we should not get the olympics. Pitch the concrete towards the street morons.
Evidently, you've never seen a Chicago concrete pour in action. We figure they must save money by not having a surveyor look at the concrete forms after they nail them all together. We have yet to see a curb gutter in the past 28 years drain a street properly after being poured.

We can't recall ever seeing a city project that didn't have major cracking issues with any concrete construction. Remember the concrete columns cracking and flaking in the Monroe Street garage? They had to tear out dozens and wrap hundreds in wire meshing.

And if you truly want to see something amusing, go up to the 5th Floor at HQ and bring a dozen marbles and half as many Hot Wheels cars. Drop then at different points along the corridors and watch them roll! We've heard that Patrol Division has a Pinewood Derby Racing League every other Thursday and they don't even need ramps.

Aucun commentaire:

Enregistrer un commentaire